Talks of Record Bottlenecks

Bottlenecks

Specific bottlenecks holding back progress, with sources.

  • 11current bottlenecks
  • 8fields
  • 4kinds of constraint
  • 11source documents

Why does connecting new projects and data centers to the grid take so long?

Electric grid

  • Interconnection to operation now takes 55 months for new power projectsA 2025 Berkeley Lab report says the typical project built in 2024 took 55 months from interconnection request to commercial operations. That compares with 36 months in 2015 and 22 months in 2008.Electric grid · Regulatory · December 2025
  • Large power transformer lead times of 36 to 60 monthsA 2024 U.S. Department of Energy report to Congress says lead times for acquiring a large power transformer are commonly quoted at 36 months. Maximum lead times reach as much as 60 months.Electric grid · Supply · July 2024
  • Grid power for large data centers can take 4 to 5+ yearsA 2026 source reports that building a data center typically takes 18 to 36 months. It says growing interconnection queues and processing backlogs can mean powering the site from the grid often takes 4 to 5 or more years.Electric grid · Physical · March 2026

All 3 in Electric grid

What limits how well hydrogen electrolyzers scale and follow variable power?

Hydrogen

All 2 in Hydrogen

What limits how fast GPUs can run large language model inference?

AI infrastructure

All 1 in AI infrastructure

What makes large-scale carbon capture energy hungry and hard to sustain?

Carbon management

  • Capture energy use, absorbent loss and stability constrain large-scale CCSA 2022 review reports that the energy consumption of low-concentration CO2 capture and the depletion of chemical absorbents are key constraints on large-scale CCS deployment. It also names the operational efficiency and stability of post-combustion capture systems.Carbon management · Physical · March 2022

All 1 in Carbon management

Can mined supply keep up with demand from climate pledges?

Critical minerals

  • Copper supply gap persists in 2030 despite high mined outputThe IEA's Global Critical Minerals Outlook 2024, published in May 2024, reports that even in a high production case with almost 2 Mt of extra mined supply, a 2.2 Mt (10%) gap remains against demand from government climate pledges. It also reports a 4.5 Mt (20%) shortfall against the NZE Scenario in 2030, and stresses the long lead times for new production.Critical minerals · Supply · May 2024

All 1 in Critical minerals

Where can fusion materials be tested under realistic conditions?

Fusion energy

All 1 in Fusion energy

How much of a geothermal plant's cost goes into drilling wells?

Geothermal energy

  • Full-size well drilling drives geothermal plant capital costA 2025 National Renewable Energy Laboratory update reports that drilling full-size wells for resource confirmation and field development accounts for 30% to 57% of the overnight capital cost of a new plant. The figure comes from NREL internal analysis.Geothermal energy · Physical · July 2025

All 1 in Geothermal energy

How heavy a burden is error correction for quantum computers?

Quantum computing

  • Quantum error correction overhead limits fault-tolerant quantum computingA March 2025 paper on fault-tolerant architectures based on erasure qubits reports that the overhead of quantum error correction is a major bottleneck for realizing fault-tolerant computation. The source gives no further detail on the size of that overhead.Quantum computing · Physical · March 2025

All 1 in Quantum computing